top of page

PACIFIC DENTAL HOLDINGS PTE LTD

Design & Build | Dental Clinic Renovation

Om Decor was appointed as the Design & Build contractor for the renovation of Pacific Dental Holdings’ clinic at Wisma Atria. The project involved full regulatory coordination, specialist dental fit-out works, and integrated equipment installation within a live commercial environment.

This clinic was planned to meet both operational efficiency and regulatory compliance, while creating a welcoming and professional experience for patients.

Project Scope

1. Regulatory & Technical Documentation

  • Full document submission for authority approvals

  • Work Permit application and site safety documentation

  • Risk Assessment, project planning, and construction scheduling

  • Technical and design drawings for coordination

  • Fire Safety Certification and Professional Engineer (PE) endorsements

2. Project Management & Supervision

  • On-site supervision and trade coordination

  • Construction progress tracking and quality control

  • Stakeholder coordination and authority inspections

3. Full Dental Fit-Out Works

  • Custom carpentry and cabinetry

  • Metal fabrication works

  • Electrical, plumbing, and sanitary systems

  • Upholstery and soft finishes

  • Glass works and internal partitions

  • Sound-resistant walls for treatment rooms

  • Lead-lined doors and walls for X-ray rooms

4. Dental Equipment Deployment

  • Installation and setup of compressors and suction systems

  • Dental chairs and treatment units

  • OPG imaging equipment

  • Autoclaves and dental sterilisation systems

5. Inspection & Licensing

  • Authority inspections and clearance

  • Licensing preparation and submission support

 

Project Details

Location:
Wisma Atria Mall, Office Tower #18-04/05
Size: Approx. 2,500 sqft

Key Design Considerations

Layout Planning
Optimised zoning for reception, waiting area, consultation rooms, and treatment rooms to support smooth patient flow.

Lighting Strategy
Task lighting for treatment rooms and ambient lighting for waiting areas to create comfort and clarity.

Interior Atmosphere. Use of décor, greenery, and finishes to enhance the patient experience.

System Upgrades
Electrical, plumbing, and air-conditioning systems designed to meet healthcare standards.

Radiation Protection. Integrated shielding systems for dental imaging rooms to comply with radiation safety requirements.

office renovation contractor
office contractor singapore
office contractor singapore
office contractor singapore
office contractor singapore

Om Decor Pte Ltd

 

OM LAB+ Decision & Verification Lab

55 Ayer Rajah Cres #06-05/06 S139949

Renovation decisions, materials, systems, and workflows are reviewed and locked before execution.

 

OO : Operations Office

21 Bukit Batok Cres #02-70 S658065​

Project management, administration, QS, drawings, and coordination

CFF: Carpentry & Fabrication Facility

6 Gambas Way #07-01 S756939

Controlled fabrication and pre-verification of custom components prior to site execution
 

Contact

Whatsapp (65) 9277 9906

Email projects@om-decor.com

ENQUIRY FORM

(Response <12 Hours, Mon - Fri)

Upload File
Upload supported file (Max 15MB)

Thank you and we will contact you soon

Privacy Policy

Copyright © 2026 Om Decor Pte. Ltd.          All Rights Reserved.

Terms & Conditions

bottom of page